Port News

Railway study to assess freight links at Chattogram Port terminals

A World Bank-funded preparation facility will examine rail access to existing and planned terminals, with studies due by the end of 2027.

Mongla Port passes last year’s container total with months to spare

The port handled 25,250 TEUs between July 2025 and mid-April 2026, above the 21,456 TEUs it moved in the whole of FY2024-25.

Payra Port commissions five cranes as a mother vessel berths at the jetty

The 170-metre Fan Zhou-6 berthed directly at Payra’s first terminal, the first such call in nearly two years, as new ship-to-shore, yard and mobile cranes entered service.

Chattogram Port reports record container and cargo volumes for FY2025-26

Container throughput reached 3.52 million TEUs and cargo 137.74 million tonnes, according to Chittagong Port Authority figures.

Background: Payra master plan set out transshipment role and 20-30% lower tariffs

Reported in July 2025: the Payra Port Authority said a new master-plan feature would handle transshipment for up to 15 vessels, with a 650m jetty for 3,000-3,500 TEU ships.

Payra port expected to be fully operational in early 2027, minister tells parliament

Shipping Minister Shaikh Rabiul Alam said the first terminal, connecting roads and the Andharmanik bridge are due by December 2026, but the Rabnabad channel is still too shallow for commercial ships.

No plan to hand Chattogram port to a foreign operator, shipping minister tells parliament

On 22 April 2026 Shipping Minister Shaikh Rabiul Alam said the port is an autonomous body under the CPA Act 2022, while noting foreign operators at Patenga and the Laldia PPP deal.

APM Terminals unveils $550m Laldia terminal layout, aims to start construction by end-2026

The 30-year PPP terminal at Chattogram is designed for 800,000+ TEUs a year and ships of up to 6,000 TEUs, more than double the port's current practical limit.