Chattogram Port

DP World signs 15-year deal to run Chattogram’s New Mooring Container Terminal

The concession covers the port's largest container terminal, which handles over 40% of Chattogram's container traffic. The port authority keeps ownership.

In Depth: why Chattogram’s direct Europe container services came and went

In 2022 at least seven direct routes launched from Chattogram as freight soared; by late 2023 most had stopped. What the record shows and what bigger terminals might change.

In Depth: Chattogram’s first tariff rise since 1986, one year on

An average 41% increase took effect in October 2025, followed by shipping-line surcharges. What changed, who pays, and what the port earned in 2025.

DP World signs 15-year concession to run Chattogram’s New Mooring Container Terminal

Chittagong Port Authority keeps ownership of the terminal while the Dubai-based operator takes over operations, maintenance and upgrades. Workers’ groups remain opposed.

Railway study to assess freight links at Chattogram Port terminals

A World Bank-funded preparation facility will examine rail access to existing and planned terminals, with studies due by the end of 2027.

Chattogram Port reports record container and cargo volumes for FY2025-26

Container throughput reached 3.52 million TEUs and cargo 137.74 million tonnes, according to Chittagong Port Authority figures.

No plan to hand Chattogram port to a foreign operator, shipping minister tells parliament

On 22 April 2026 Shipping Minister Shaikh Rabiul Alam said the port is an autonomous body under the CPA Act 2022, while noting foreign operators at Patenga and the Laldia PPP deal.

APM Terminals unveils $550m Laldia terminal layout, aims to start construction by end-2026

The 30-year PPP terminal at Chattogram is designed for 800,000+ TEUs a year and ships of up to 6,000 TEUs, more than double the port's current practical limit.